In the Rostov Region, the construction of the second stage of the “Access to Platov Airport” highway is in the final stages. The new modern four-lane road connecting the M-4 Don federal highway and the northern bypass of Rostov will soon become available to all residents of the region and guests of the Don Region.
According to the general director of Donaerodorstroy, Sergey Zubanov: “Under the contract, all construction work at this facility should be completed in November 2019, but realizing the importance of this infrastructure project, the Donaerodorstroy team took on increased obligations and plans to open the road already in August".
It should be remembered that in July 2018, literally with the final whistle about the end of the last match of the World Cup in Rostov, our road builders went to the site.
In the construction season, work was carried out around the clock, without slowing down the fast pace, and, of course, not to the detriment of quality.
The new transport corridor will provide comfortable and safe traffic, free traffic to the Rostov airborne from Taganrog and Azov, as well as exit from the northern part of the region (without entering Rostov-on-Don from the Novocherkassk highway).
Technical characteristics of the facility:
The category of road is IB.
The length of the site is 12.4 km.
The number of lanes is 4.
Estimated speed - 120km / h.
The width of the subgrade is 28.5 m.
The width of the carriageway is 2x7.5.
Artificial constructions:
Reinforced concrete bridge over the Rubezhnaya beam: length - 180.80 pm
Reinforced concrete bridge over the Tuzlov River: length - 127.30 pm
Reinforced concrete bridge over the Bolshaya Nesvetai River: length - 106.75 m
Reinforced concrete overpass through a / d at PK22 + 50: length - 27.18 running meters
Reinforced concrete overpass of transport interchange on PK57 + 50: length - 27.18 running meters